We have had strong winds almost every day this spring. Maybe that’s the reason the zipper stitching pulled out of the front door of the hoophouse. With some encouragement from Sam, I decided to repair it with some hand stitching. It was challenging because, of course, it was windy when I worked on it.
![](https://gemtactics.net/@XRoad/wp-content/uploads/2021/05/img_2630.jpg)
![](https://gemtactics.net/@XRoad/wp-content/uploads/2021/05/img_2631.jpg)
![](https://gemtactics.net/@XRoad/wp-content/uploads/2021/05/img_2632.jpg)
![](https://gemtactics.net/@XRoad/wp-content/uploads/2021/05/img_2633.jpg)
![](https://gemtactics.net/@XRoad/wp-content/uploads/2021/05/img_2634.jpg)